This is the 2nd of 2 sites of the Innovation Centre. 

A total of over 200m across both the Centre's have been mainly hand dug due to protection orders on the trees within the grounds. 

5 Mini EV Blocks for AC chargers and 1 B500 EV Block for a DC Charger has been installed. All EV spaces have wheel stops installed to protect the chargers. There are 3 designated spaces for disabled users. 