Holiday Resort
Completed works for 6no. ABB Charge Points with built-in cameras.
​
We trenched a huge 95m through Asphalt Carriageway and Compacted Ground, with 4 Access Chambers along the route for easy access.
​
1 Feeder Pillar base was installed to facilitate a VR9 Double Door Feeder Pillar.
5 Sign Posts Installed
Each bay has wheel stops for protection