top of page
Gravells Kia Roll Out - Narberth
The start of a roll out for EV Wales. 10 EV Block minis and 1 B600 EV Block for the DC Charger installed and a trench of 70m through grass. We installed 3 600mm Access Chambers, 2 being double depth to facilitate the ducting.
The site is now having the Zaptec Chargers installed.
bottom of page