Engineering Staff Car Park
Works to install EV infrastructure to a staff parking area, in readiness for the twin 22kW chargers and a 50kW rapid charger. This consisted of;
-
Trenching 35m through slabs and compacted ground
-
Installation of 1 access chamber, 2 EV charge point concrete bases, a feeder pillar base, and an earth pit
-
Laying 110mm and 63mm duct in the trenches
-
Reinstatement of trenches to match existing surface