Food Manufacturing Company

A 12m trench under slabs to install 3no. 600 x 600mm concrete bases with pin kerbs for EV Chargers, daisy chaining the 63mm black duct. These bases will facilitate EV Chargers to charge 6 vehicles. An earth pit was installed at the end of the run (requested by the client).

​

​