Haulage Company Roll-Out

We are in the process of a nation wide roll out to facilitate EV Charging for new HGV vehicles. The first phase is at 7 sites around London.

These charging bases are for Kempower Rapid Chargers. 

​

The charger base is raised on a plinth using kerbs. We have also installed heavy duty bollards, filled with concrete, at each corner of the base for extra protection from collisions.

 

The layout is drawn out accurately to ensure that the crews know what has to be built.

DC Charger Base Design_edited.jpg
WhatsApp Image 2023-01-12 at 09.40.22.jpg
cdv_photo_008.jpg

Site 1

cdv_photo_011.jpg
cdv_photo_014.jpg
cdv_photo_0007.jpg
cdv_photo_033.jpg
cdv_photo_012.jpg
cdv_photo_015(1).jpg

Site 2

cdv_photo_011.jpg
cdv_photo_003(1).jpg
cdv_photo_008.jpg
cdv_photo_023.jpg
cdv_photo_011.jpg
cdv_photo_008.jpg
cdv_photo_011.jpg
cdv_photo_012.jpg
cdv_photo_010.jpg

Site 3

cdv_photo_001.jpg
cdv_photo_021.jpg
croydon complete.jpg
cdv_photo_005(1).jpg
cdv_photo_014.jpg
cdv_photo_006(1).jpg

Site 4

cdv_photo_026.jpg
cdv_photo_020.jpg
cdv_photo_008_edited.jpg